Devopment of the airport Kloten (1999-2004)
During the development period
of the airport in Zurich, construction vehicles had to be able to corss the runways.
A total of 7 IMO traffic light units were installed. Programming had to be adapted to
the specific needs and requirements of the airport.

A cable controlled traffic light unit secured the runway.